At Grup Voltes we are working intensively on the earthmoving project for our client @Hinaco, in the construction of a pizza manufacturing warehouse in the town of San Esteban de Litera (Huesca).
25,254 m³ of excavation of topsoil will be carried out, 152,325 m³ of excavation in ripped rock waste, and 152,325 m³ of embankment, to achieve an optimal level of the terrain, for the subsequent construction of the warehouse.
Responsible for the work: Andreu Voltes
Manager: Conrado Gimenez